Modeling and schematics
Looking for schematics or helpful tips on modeling? This might be the place for you to share your ideas.
Re: Schematics Drawing
Posted by:
Simon
()
Date: April 24, 2013 04:19AM
This summer I was able to add a large number of new things and make updates (listed below) to my U-1308 drawing.
There are now over 61,000 objects in this dorsal view and this is reveal in the size of the PFD file which has grown to over 22MB Significant changes between this version and the previous are: the wooden deck, bridge/Wintergarten and the piping around the engine room.
A reminder about this PDF document, it contains different layers to make viewing easier. These layers can be view all together or separately by selecting or deselecting layers within Adobe Reader. To best view the drawing, it is best to select only the layers that you want to see, another the drawing can become very hard to view.
Happy view
Simon
Download Link
PDF Version - 22 MB
[www.mediafire.com]
Zip Version - 10 MB
[www.mediafire.com]
Version 0.4 ~ 24 April 2012
Added missing pressures hull markings.
Added missing labels for the Conning Tower Casting.
Added missing valve in the inlet Schnorchel piping.
Added deck hatches.
Stern Torpedo Loading
Galley
Exhaust
Exhaust Outlet Control Valve
Mid section access
Fuel Oil
Main Vent Access
Engine Lubricating Oil hatches.
Added rear Casting Bollards.
Added High Pressure Air Lines for Bank 6.
Tweaked alignment of the stern steel plating.
Tweaked alignment of the saddle tanks.
Tweaked alignment of the Fuel Oil and Engine piping.
Tweaked alignment of the Low pressure exhaust gas and emergency blowing systems.
Tweaked alignment of the Main exhaust gas blow valve
Corrected the smaller metal deck access hatches.
Increase compass access opening.
Updated Interconnector MB & ROL Tank 2
Corrected pipe alignment.
Corrected Saddle Tank openings.
Revise Emergency vent valves to match correct valves type.
Added more detail to Vent valves, main ballast and reserve fuel oil tanks.
Corrected pipe alignment.
Added pipe colour to the first section of piping only.
Updated Exhaust System.
Reduce the number and size of bolts on the pipe flanges.
Increase size of the pipes over the muffler exhaust valves.
Added locking plates to the pipe flanges.
Added Grease Distributors.
Added control linkage for Exhaust valves and grinders.
Added late war Exhaust outlets.
Tweaked alignment of Exhaust outlet pressure hull openings.
Tweaked alignment of Exhaust outlet valves.
Added Muffler Exhaust Valve.
Added aft section of Fuel oil compensating system
There are now over 61,000 objects in this dorsal view and this is reveal in the size of the PFD file which has grown to over 22MB Significant changes between this version and the previous are: the wooden deck, bridge/Wintergarten and the piping around the engine room.
A reminder about this PDF document, it contains different layers to make viewing easier. These layers can be view all together or separately by selecting or deselecting layers within Adobe Reader. To best view the drawing, it is best to select only the layers that you want to see, another the drawing can become very hard to view.
Happy view
Simon
Download Link
PDF Version - 22 MB
[www.mediafire.com]
Zip Version - 10 MB
[www.mediafire.com]
Version 0.4 ~ 24 April 2012
Added missing pressures hull markings.
Added missing labels for the Conning Tower Casting.
Added missing valve in the inlet Schnorchel piping.
Added deck hatches.
Stern Torpedo Loading
Galley
Exhaust
Exhaust Outlet Control Valve
Mid section access
Fuel Oil
Main Vent Access
Engine Lubricating Oil hatches.
Added rear Casting Bollards.
Added High Pressure Air Lines for Bank 6.
Tweaked alignment of the stern steel plating.
Tweaked alignment of the saddle tanks.
Tweaked alignment of the Fuel Oil and Engine piping.
Tweaked alignment of the Low pressure exhaust gas and emergency blowing systems.
Tweaked alignment of the Main exhaust gas blow valve
Corrected the smaller metal deck access hatches.
Increase compass access opening.
Updated Interconnector MB & ROL Tank 2
Corrected pipe alignment.
Corrected Saddle Tank openings.
Revise Emergency vent valves to match correct valves type.
Added more detail to Vent valves, main ballast and reserve fuel oil tanks.
Corrected pipe alignment.
Added pipe colour to the first section of piping only.
Updated Exhaust System.
Reduce the number and size of bolts on the pipe flanges.
Increase size of the pipes over the muffler exhaust valves.
Added locking plates to the pipe flanges.
Added Grease Distributors.
Added control linkage for Exhaust valves and grinders.
Added late war Exhaust outlets.
Tweaked alignment of Exhaust outlet pressure hull openings.
Tweaked alignment of Exhaust outlet valves.
Added Muffler Exhaust Valve.
Added aft section of Fuel oil compensating system
Subject | Written By | Posted |
---|---|---|
Schematics Drawing | Simon | 04/27/2012 07:55PM |
Re: Schematics Drawing | Lars Henriksson SM6EBQ | 07/29/2012 01:27AM |
Re: Schematics Drawing | SM6EBQ | 07/29/2012 01:42AM |
Re: Schematics Drawing | Teaker11 | 07/29/2012 03:05PM |
Re: Schematics Drawing | Simon | 04/24/2013 04:19AM |
Re: Schematics Drawing | General hobbyist | 06/28/2013 01:43PM |
Re: Schematics Drawing | Simon | 06/28/2013 07:32PM |
Re: Schematics Drawing | General Hobbyist | 06/28/2013 08:00PM |
Re: Schematics Drawing | David | 03/13/2016 06:19PM |
Re: Schematics Drawing | Dan Bell | 08/29/2023 12:19PM |
Re: Schematics Drawing | Simon | 11/17/2023 08:04PM |
Re: Schematics Drawing | urflar | 01/07/2015 07:25PM |
Re: Schematics Drawing | Simon | 01/07/2015 08:20PM |
Re: Schematics Drawing | Simon | 03/05/2016 12:20AM |
Re: Schematics Drawing | Simon | 11/02/2016 09:12PM |
Re: Schematics Drawing | Steve Walker | 10/30/2015 11:51PM |